Skip to content

The Demo Team — a division of Restoration On Demand

Selective Demolition · The Demo Team

Selective Demolition in Fort Lauderdale & South Florida

Take out exactly what the plan says, protect everything that stays. Targeted removal of non-structural partitions, soffits, built-ins and finishes while protecting the rooms and surfaces that stay.

Scope

What this job usually covers

Final scope is confirmed at the free walkthrough and written into your flat quote.

  • 01Non-structural partition removal
  • 02Soffit, bulkhead and built-in removal
  • 03Closet and shelving removal
  • 04Surface protection for areas that stay
  • 05Coordination with your GC schedule
  • 06Debris loading and haul-off

Scope estimator

Preset for selective demolition

Step 1 · Job type

253,000+

Step 3 · Options

Your scope so far

  • Selective demolition, about 150 sq ft
  • Haul-off included
  • No visible mold or water reported

Dollar range: set at your free walkthrough.

We do not publish demolition or mold prices online. Demo is quoted flat per job once we see access, materials and debris volume.

Carries these selections into the quote form below. Nothing is sent until you submit it.

When the wall opens

Other crews stop. We are licensed to keep going.

Florida Statutes Chapter 468, Part XVI generally requires a licensed mold remediator for remediation involving more than 10 square feet of mold, with exceptions spelled out in the statute. We hold Florida Mold Remediator License MRSR4091 and Mold Assessor License MRSA4093.

Read Florida Statutes s. 468.8411 (definitions)

Discovery protocol

  1. 01

    Stop & document

    Work pauses in that area. Photos and notes go to you.

  2. 02

    Measure

    Affected area measured in square feet, room by room.

  3. 03

    Price from the card & sign

    Standing rate card applied. You sign the change order before treatment.

  4. 04

    Remediate & keep moving

    Licensed remediation by the same crew, then demo continues.

How pricing works

The method, in writing, before anything gets opened.

Demolition: flat per job

After a free walkthrough we quote the whole job as one flat price: scope, protection, access and haul-off included as selected. No dollar figures are published online.

Mold found mid-demo: standing rate card

Priced per square foot of affected area, plus a mobilized demo rate and a per-room minimum, from a rate card set before the job. Signed as a change order before treatment.

Services

Other demolition services

Mold-safe demolition

Licensed remediator on the crew when walls open.

Google reviews

What our customers say

Reviews are for Restoration On Demand as a whole.

Loading live Google reviews…

Read all reviews on Google

Selective Demolition questions

No. Selective demolition covers non-structural elements. Structural changes are a matter for your engineer and general contractor.

Yes. Send the drawings or scope sheet with the quote request and we confirm it at the walkthrough.

Floor protection, plastic barriers and careful cut lines. What needs protecting is listed in the flat job quote.

We stop that area, document it with photos, measure the affected square footage and price it from our standing mold rate card. You sign a change order before any treatment starts. Mold remediation is charged per square foot of affected area; we do not publish dollar amounts online.

Service area

Demolition by city

All 104 cities we serve

Free walkthrough

Tell us what is coming out.

Your estimator selections are already filled in. The office calls you to schedule the walkthrough. Open 24 hours Sunday through Friday; closed Saturday.

2604 SW 55th St, Fort Lauderdale, FL 33312

Photos (up to 3, JPEG/PNG/WebP, 5 MB each)

Photos are stored privately for our office. We call to schedule; no price is quoted until the walkthrough.

All demolition services